|
Advanced PDF Repair 2.0 by: DataNumen, Inc.
|
|
Advanced PDF Repair(APDFR) is a powerful PDF recovery tool.
License: Demo, Price: $149.95 US
[read more] [download] [buy now]
|
Downloads: 464
Size: 1307 K
Date: 2009-03-16
|
Keywords: pdf, acrobat, adobe, repair, recovery, recover, restore, fix, file, tool, utility, corrupt, corrupted, damaged, error, rescue, files, data, disaster, document
|
|
Access Repair 7.06.03 by: Access Repair
|
|
Powerful tool to repair corrupt access database files
License: Shareware, Price: $199.00 US
[read more] [download]
|
Downloads: 246
Size: 923 K
Date: 2009-03-14
|
Keywords: access repair, repair corrupted access database, access 2003 repair, microsoft access repair, access repair utility, repair access database, msaccess repair, mdb repair
|
|
Rgrow 1.3 by: Canadian Mind Products
|
|
RGrow resizes fixed length records padding or chopping.
License: Freeware, Price: $0.00 US
[read more] [download]
|
Downloads: 190
Size: 67 K
Date: 2009-03-11
|
Keywords: rgrow, fixed length records, expand, truncate, reformat
|
|
Registry Drill 4.3.0.2 by: Easy Desk Software
|
|
The Registry Drill is the world's most powerful Registry utility and cleaner.
License: Shareware, Price: $39.95 US
[read more] [download]
|
Downloads: 175
Size: 8227 K
Date: 2009-03-08
|
Keywords: registry fix, registry cleaner
|
|
WinCleaner OneClick Professional Clean 11.2 by: Business Logic Corporation
|
|
Automatic Internet, PC and Registry Optimizer. It's safe. It's easy.
License: Shareware, Price: $29.95 US
[read more] [download]
|
Downloads: 347
Size: 5096 K
Date: 2009-02-10
|
Keywords: registry, registry mechanic, registry cleaner, junk cleaner, cookies, uninstall, system mechanic, system maintenance, registry optimizer, registry fix, internet junk
|
|
Recovery for Writer 1.1.0907 by: Recoveronix Ltd.
|
|
Recovery for Writer is data recovery software for OpenOffice documents (.odt)
License: Shareware, Price: $99.00 US
[read more] [download]
|
Downloads: 180
Size: 1122 K
Date: 2009-02-04
|
Keywords: recover writer, damaged writer recovery, fix odt, restore corrupted odt, recover openoffice writer, fix corrupted openoffice, odt corrupt, damaged writer document, fix document
|
|
Recovery for Calc 1.1.0906 by: Recoveronix Ltd.
|
|
Recovery for Calc is data recovery software for OpenOffice spreadsheets 9 (.ods)
License: Shareware, Price: $99.00 US
[read more] [download]
|
Downloads: 199
Size: 1122 K
Date: 2009-01-31
|
Keywords: recover calc, damaged calc recovery, fix ods, restore corrupted ods, recover openoffice calc, fix corrupted openoffice, ods corrupt, damaged calc spreadsheets, fix shpreadsheet
|
|
Recovery for Photoshop 1.1.0902 by: Recoveronix Ltd.
|
|
Recovery for Photoshop fixes corrupted Adobe Photoshop image files (.PSD, .PDD)
License: Demo, Price: $149.00 US
[read more] [download]
|
Downloads: 225
Size: 1041 K
Date: 2009-01-19
|
Keywords: photoshop recovery, psd recovery, photoshop corrupted, psd corrupted, corrupted photoshop, corrupted psd, psd repair, repair photoshop, photoshop repair, repair psd, fix psd, fix photoshop, psd fix, photoshop damaged
|
|
1st Registry Repair 1.6 by: Elongsoft Software
|
|
Optimize system registry by finding and removing errors and invalid entries.
License: Shareware, Price: $19.95 US
[read more] [download]
|
Downloads: 189
Size: 964 K
Date: 2008-12-26
|
Keywords: registry repair, registry fix, registry cleaner, registry clean, regcleaner, registry cleaners, window registry, regclean, registry optimizer, registry cleanup, registry optimizer, registry manager, registry optimization, registry booster, tune up, tuneup
|
|
Recover USB Drive 3.0.1.5 by: Laptops data recovery
|
|
Pen drive data recovery utility undelete music file from formatted storage media
License: Shareware, Price: $45.00 US
[read more] [download]
|
Downloads: 235
Size: 643 K
Date: 2008-12-09
|
Keywords: USB, pen, drive, music, files, recovery, program, undelete, corrupted, documents, lost, photos, deleted, file, erased, images, formatted, office, records, crashed, storage, media, JPG, JPEG, GIF, PNG, MPEG, MP3, XLS, audio, video, retrieval, software
|
|
|